The story
The chairlift on the eastern slope of Mount Teghenis first opened in 1967; in the 2000s it was rebuilt with modern Leitner lifts. Five stages climb from about 1,966 m to 2,819 m, with roughly 30 km of slopes.
The ski season usually runs from mid-December to March, sometimes into April on the upper runs. Outside the season the lift still runs, and the ride to the top takes about 40 minutes with changes; on clear days you see Lake Sevan and Mount Ararat. There are cafés at the intermediate stations.
What to see
01
Up Mount Teghenis
Views of Lake Sevan and Ararat from the top; take a warm layer even in summer.
02
Ski slopes
In winter, runs for all levels; ski rental shops are by the lower station.
03
Summer walks
In summer, walk down from the upper stations through alpine meadows.
Before you go
Opening hours can change, especially on holidays. We recommend calling or checking before your visit. Runs daily in season, weather permitting; call to confirm off-season hours.
Nearby
All of Kotayk →- Hotel · Tsaghkadzor · next door Best Western Alva Hotel & Spa
-
Monastery · 2.1 km Kecharis Monastery
-
Museum · 2.4 km Orbeli Brothers House-Museum
- Guesthouse · 2.9 km Cozy Villa in Tsaghkadzor
- Hotel · Tsaghkadzor · 3.0 km Nur Hotel
- Hotel · 3.2 km Cottages Tsaghkadzor
Showing 5 of 6
Tours that stop here
All tours →Photos: Dr Marie eyes, CC BY 4.0 · Ավետիսյան91, CC BY-SA 4.0